-
SONRIS
DNR has undergone a project to re-engineer and redesign its information systems for all offices of the department. Specifically, DNR has implemented Strategic Online Natural... -
University of Illinois Campus Deep Direct-Use Feasibility Study - Design of...
Includes specification sheet, wellbore geometry, and drilling fluids at section target depth associated with the design of Injection Well #1 (CCS1) for the Illinois Basin... -
Advanced TidGen Power System - ORPC Public Technical Report, Device Design
Technical report for public dissemination on the design progress for the Advanced TidGen(R) Power System. -
Map of Validation of Innovative Exploration Technologies for Newberry Volcano
A map showing location of wells permitted, drilled and seismic test, as part of validation of innovative exploration technologies done for the Newberry Volcano project in 2012. -
Three Sisters, Mt. Jefferson, and Mt. Washington wilderness areas in Oregon:...
This data publication contains 1991 permit information and mail-back survey responses from visitors to the Three Sisters, Mt. Washington, and Mt. Jefferson Wilderness areas in... -
M3 Wave DMP/APEX WEC Projected LCOE
Projected LCOE model for the Delos-Reyes Morrow Pressure Device (DMP), commercialized by M3 Wave LLC as "APEX," based on information gained during project performance. -
Occupancy Permits (via DDOT TOPs)
The District Department of Transportation has management and oversight responsibility for the use and occupancy of the public space. This data sets shows occupancy permits from... -
M3 Wave DMP/APEX WEC Projected LCOE
Projected LCOE model for the Delos-Reyes Morrow Pressure Device (DMP), commercialized by M3 Wave LLC as "APEX," based on information gained during project performance.