Reference Model 2 Cost Breakdown (RM2: River Current Turbine)
Contains the Reference Model 2 (RM2) spreadsheets with the cost breakdown structure (CBS) for the levelized cost of energy (LCOE) calculations for a single RM2 device and... -
LCOE Baseline for RME Surge WEC Device
This submission includes all the data to support an LCOE baseline assessment for the Resolute Marine Energy (RME) Surge WEC device. -
Reference Model 5 Cost Breakdown (RM5: Oscillating Surge Flap)
Contains the Reference Model 5 (RM5) spreadsheets with the cost breakdown structure (CBS) for the levelized cost of energy (LCOE) calculations for a single RM5 device and... -
LCOE Baseline for RME Surge WEC Device
This submission includes all the data to support an LCOE baseline assessment for the Resolute Marine Energy (RME) Surge WEC device. -
TidGen LCOE Workbooks
Workbooks showing Annualized Energy Production, Cost Breakdown Structure, Levelized Cost of Electricity for DOE Reference Tidal Project 1) Baseline TidGen Power System 2) TidGen... -
Reference Model 1 Cost Breakdown (RM1: Tidal Current Turbine)
Contains the Reference Model 1 (RM1) spreadsheets with the cost breakdown structure (CBS) for the levelized cost of energy (LCOE) calculations for a single RM1 device and... -
Reference Model 3 Cost Breakdown (RM3: Wave Point Absorber)
Contains the Reference Model 3 (RM3) spreadsheets with the cost breakdown structure (CBS) for the levelized cost of energy (LCOE) calculations for a single RM3 device and... -
TidGen LCOE Workbooks
Workbooks showing Annualized Energy Production, Cost Breakdown Structure, Levelized Cost of Electricity for DOE Reference Tidal Project 1) Baseline TidGen Power System 2) TidGen... -
Reference Model 4 Cost Breakdown (RM4: Ocean Current Turbine)
Contains the Reference Model 4 (RM4) spreadsheets with the cost breakdown structure (CBS) for the levelized cost of energy (LCOE) calculations for a single RM4 device and... -
Reference Model 1 Cost Breakdown (RM1: Tidal Current Turbine)
Contains the Reference Model 1 (RM1) spreadsheets with the cost breakdown structure (CBS) for the levelized cost of energy (LCOE) calculations for a single RM1 device and... -
LCOE Baseline for OE Buoy WEC Device
Capex numbers are in $/kW, Opex numbers in $/kW-yr. Cost Estimates provided herein are based on concept design and basic engineering data and have high levels of uncertainties... -
Reference Model 5 Cost Breakdown (RM5: Oscillating Surge Flap)
Contains the Reference Model 5 (RM5) spreadsheets with the cost breakdown structure (CBS) for the levelized cost of energy (LCOE) calculations for a single RM5 device and... -
Reference Model 4 Cost Breakdown (RM4: Ocean Current Turbine)
Contains the Reference Model 4 (RM4) spreadsheets with the cost breakdown structure (CBS) for the levelized cost of energy (LCOE) calculations for a single RM4 device and... -
Reference Model 6 Cost Breakdown (RM6: Oscillating Water Column)
Contains the Reference Model 6 (RM6) spreadsheets with the cost breakdown structure (CBS) for the levelized cost of energy (LCOE) calculations for a single RM6 device and... -
Centipod WEC, Advanced Controls, Baseline LCOE
Project baseline levelized cost of energy (LCOE) model for the Centipod WEC containing annual energy production (AEP) data, a cost breakdown structure (CBS), model... -
Reference Model 5 Cost Breakdown (RM5: Oscillating Surge Flap)
Contains the Reference Model 5 (RM5) spreadsheets with the cost breakdown structure (CBS) for the levelized cost of energy (LCOE) calculations for a single RM5 device and... -
LandRAY PTO Testing Utilizing the NREL NWTC 5MW Dynamometer
The overarching project objective is to demonstrate the feasibility of using an innovative PowerTake-Off (PTO) Module in Columbia Power's utility-scale wave energy converter... -
TidGen LCOE Workbooks
Workbooks showing Annualized Energy Production, Cost Breakdown Structure, Levelized Cost of Electricity for DOE Reference Tidal Project 1) Baseline TidGen Power System 2) TidGen...