Western gas sands project status report, August 1-31, 1980

August progress of government-sponsored projects, directed towards increasing gas production from the low permeability gas sands of the western United States, is summarized in this report. Superior Oil has not yet made a decision concerning the use of their lease as a possible MWX site. Bartlesville Energy Technology Center has completed embedment tests of 20/40 mesh bauxite into grey berea and typical tight gas sand cores. At Lawrence Livermore National Laboratory, numerical routines have been developed for computing unsteady growth of hydraulically-driven cracks in plain and circular geometries. Three studies have been initated at Sandia National Laboratories: laboratory determination of the fracture crack-tip process zone; detailed petrographic characterization of a Mesaverde tight gas sand lens and surrounding shale; and determination of oil-base drilling fluid invasion in support of the MWX.

Data and Resources

Additional Info

Field Value
Last Updated August 9, 2019, 04:31 (CDT)
Created August 9, 2019, 04:31 (CDT)
Citation "\"Western Gas Sands Project Status Report, August 1-31, 1980, Not Available, US Department of Energy, 1980 Aug, 62.\""
Is NETL associated "\"No\""
Organization "\"CER Corp\""
spatial "\"{\"type\":\"MultiPolygon\",\"coordinates\": [[[[-109.045616, 31.343452], [-109.051346, 32.77955], [-109.04848, 36.99664], [-108.372475, 36.99947], [-103.077866, 36.99976], [-102.99771, 36.998524], [-102.9974, 36.49237], [-103.05564, 32.085117], [-103.05841, 32.00202], [-108.21065, 31.343853], [-109.045616, 31.343452]]]]}\""