<https://data.amerigeoss.org/dataset/2917d4aa-4cef-4c48-af40-129d40a20990> a dcat:Dataset ;
    dct:description "This data was collected during the project: Preparation of a high-level least-cost geospatial analysis for grid and off-grid electrification options Synoptic analysis of low-cost electrification solutions in Congo " ;
    dct:identifier "2917d4aa-4cef-4c48-af40-129d40a20990" ;
    dct:issued "2025-09-18T20:30:50.741886"^^xsd:dateTime ;
    dct:modified "2025-09-18T20:30:50.741893"^^xsd:dateTime ;
    dct:publisher <https://data.amerigeoss.org/organization/d92053b4-d997-4aa8-bbda-02a0753be4e3> ;
    dct:title "Congo Brazzaville - Electrification Status Major Cities (2019)" ;
    owl:versionInfo "None" ;
    dcat:distribution <https://data.amerigeoss.org/dataset/2917d4aa-4cef-4c48-af40-129d40a20990/resource/57c69ba8-5665-4c4d-9784-e48c15560666>,
        <https://data.amerigeoss.org/dataset/2917d4aa-4cef-4c48-af40-129d40a20990/resource/65e3722e-b62b-4103-aad2-148137c3a855>,
        <https://data.amerigeoss.org/dataset/2917d4aa-4cef-4c48-af40-129d40a20990/resource/85d685f2-9825-4e21-959e-26a3b8f05f5b> ;
    dcat:keyword "AmeriGEO",
        "AmeriGEOSS",
        "Energy",
        "GEO",
        "GEOSS",
        "Global",
        "SDG",
        "SDG7",
        "World Bank" .

<https://data.amerigeoss.org/dataset/2917d4aa-4cef-4c48-af40-129d40a20990/resource/57c69ba8-5665-4c4d-9784-e48c15560666> a dcat:Distribution ;
    dct:description "In line with the Government of Congo’s stated objective of achieving 100% electrification of administrative headquarters, the consultant has considered all district or departmental headquarters as priority localities for electrification. In addition to administrative headquarters, the consultant also evaluated and ranked candidate localities based on the socio-economic impact of electrification using a ranking index based on the health, education and economic infrastructure available in each locality. The top 10% of ranked localities were selected as “development poles” and were earmarked for electrification in the first 5-year planning phase. " ;
    dct:format "GeoJSON" ;
    dct:issued "2021-11-22T09:30:08.633144"^^xsd:dateTime ;
    dct:modified "2025-09-18T20:30:50.729943"^^xsd:dateTime ;
    dct:title "Major cities -electrification status" ;
    dcat:accessURL <https://energydata.info/dataset/2917d4aa-4cef-4c48-af40-129d40a20990/resource/57c69ba8-5665-4c4d-9784-e48c15560666/download/poles_utm32n.geojson> ;
    dcat:byteSize "178852"^^xsd:nonNegativeInteger ;
    dcat:mediaType "application/geo+json" .

<https://data.amerigeoss.org/dataset/2917d4aa-4cef-4c48-af40-129d40a20990/resource/65e3722e-b62b-4103-aad2-148137c3a855> a dcat:Distribution ;
    dct:format "XLS" ;
    dct:issued "2020-04-08T19:54:00"^^xsd:dateTime ;
    dct:modified "2025-09-18T20:30:50.729174"^^xsd:dateTime ;
    dct:title "Metadata file" ;
    dcat:accessURL <https://datacatalogfiles.worldbank.org/ddh-published/0038261/DR0046638/metadonnees-base-sig-congo-brazzaville.xlsx?versionId=2023-01-19T09:54:22.3016480Z> .

<https://data.amerigeoss.org/dataset/2917d4aa-4cef-4c48-af40-129d40a20990/resource/85d685f2-9825-4e21-959e-26a3b8f05f5b> a dcat:Distribution ;
    dct:description "In line with the Government of Congo’s stated objective of achieving 100% electrification of administrative headquarters, the consultant has considered all district or departmental headquarters as priority localities for electrification. In addition to administrative headquarters, the consultant also evaluated and ranked candidate localities based on the socio-economic impact of electrification using a ranking index based on the health, education and economic infrastructure available in each locality. The top 10% of ranked localities were selected as “development poles” and were earmarked for electrification in the first 5-year planning phase. " ;
    dct:format "SHP ZIP" ;
    dct:issued "2020-04-08T19:53:00"^^xsd:dateTime ;
    dct:modified "2025-09-18T20:30:50.728318"^^xsd:dateTime ;
    dct:title "Major cities -electrification status" ;
    dcat:accessURL <https://energydata.info/dataset/2917d4aa-4cef-4c48-af40-129d40a20990/resource/85d685f2-9825-4e21-959e-26a3b8f05f5b/download/poles_utm32n.zip> ;
    dcat:byteSize "28222"^^xsd:nonNegativeInteger ;
    dcat:mediaType "application/zip" .

<https://data.amerigeoss.org/organization/d92053b4-d997-4aa8-bbda-02a0753be4e3> a foaf:Agent ;
    foaf:name "World Bank" .