LCOE Baseline for RME Surge WEC Device
This submission includes all the data to support an LCOE baseline assessment for the Resolute Marine Energy (RME) Surge WEC device. -
LCOE Baseline for RME Surge WEC Device
This submission includes all the data to support an LCOE baseline assessment for the Resolute Marine Energy (RME) Surge WEC device. -
HydroAir Power Take Off Combined Design Report
The submission is the combined design report for the HydroAir Power Take Off (PTO). CAD drawings, circuit diagrams, design report, test plan, technical specifications and data... -
HydroAir Power Take Off Combined Design Report
The submission is the combined design report for the HydroAir Power Take Off (PTO). CAD drawings, circuit diagrams, design report, test plan, technical specifications and data... -
Centipod WEC, Advanced Controls, Baseline LCOE
Project baseline levelized cost of energy (LCOE) model for the Centipod WEC containing annual energy production (AEP) data, a cost breakdown structure (CBS), model...