-
Watershed Boundary Dataset (WBD)
The Watershed Boundary Dataset (WBD) from The National Map (TNM) defines the perimeter of drainage areas formed by the terrain and other landscape characteristics. The drainage... -
WHOLESCALE Seismic Survey 2016 Metadata at San Emidio, Nevada
1301 Vertical Component seismic instruments were deployed at San Emidio Geothermal field in Nevada in December 2016. The first record starts at 2016-12-05T02:00:00.000000Z (UTC)... -
Paleo-Dendrochronological "Tree-Ring" Hyrdoclimatic Reconstructions for...
Background Tree-ring chronologies allow assessment of hydrologic variability over centuries to millennia, gives historic context for assessing recent droughts, and can be used... -
Watershed Boundary Dataset (WBD)
The Watershed Boundary Dataset (WBD) from The National Map (TNM) defines the perimeter of drainage areas formed by the terrain and other landscape characteristics. The drainage... -
Snake River Plain Play Fairway Analysis: Phase 2 Report and Phase 3 Proposal
This report presents the results of Phase 2 of the Snake River Plain Play Fairway Analysis project, and a summary of proposed work for Phase 3. Phase 2 focused on new data... -
Paleo-Dendrochronological "Tree-Ring" Hyrdoclimatic Reconstructions for...
Background Tree-ring chronologies allow assessment of hydrologic variability over centuries to millennia, gives historic context for assessing recent droughts, and can be used... -
WHOLESCALE Seismic Survey 2016 Metadata at San Emidio, Nevada
1301 Vertical Component seismic instruments were deployed at San Emidio Geothermal field in Nevada in December 2016. The first record starts at 2016-12-05T02:00:00.000000Z (UTC)... -
Watershed Boundary Dataset (WBD)
The Watershed Boundary Dataset (WBD) from The National Map (TNM) defines the perimeter of drainage areas formed by the terrain and other landscape characteristics. The drainage... -
Climate Change Projections for Water Storage Investment Program (WSIP)
To aid applicants with quantification and monetization of benefits of proposed water storage projects per Chapter 8 of Proposition 1 (Water Code section 79750 et. seq.), the... -
Snake River Plain Play Fairway Analysis: Phase 2 Report and Phase 3 Proposal
This report presents the results of Phase 2 of the Snake River Plain Play Fairway Analysis project, and a summary of proposed work for Phase 3. Phase 2 focused on new data... -
Climate Change Projections for Water Storage Investment Program (WSIP)
To aid applicants with quantification and monetization of benefits of proposed water storage projects per Chapter 8 of Proposition 1 (Water Code section 79750 et. seq.), the... -
Snake River Plain Play Fairway Analysis: Phase 2 Report and Phase 3 Proposal
This report presents the results of Phase 2 of the Snake River Plain Play Fairway Analysis project, and a summary of proposed work for Phase 3. Phase 2 focused on new data...