Chemical Bulk Storage Facility
The Chemical Bulk Storage program applies to properties that store a hazardous substance in: • An aboveground storage tank larger than 185 gallons; • Any size underground... -
Informational Freshwater Wetland Mapping
Please note that, due to the large size, the Informational Freshwater Wetland Mapping layer cannot be download in shapefile format. The Informational Freshwater Wetland Mapping... -
Concentrated Animal Feeding Operations CAFOs
Concentrated Animal Feeding Operations (CAFOs) are farms that meet herd size thresholds and that also confine those animals for 45 days or longer during any 12-month period in... -
Scrap Metal Processors
Scrap Metal Processors (SMP) receive, process, store, and recycle metal and metal-containing products (e.g., appliances). Many SMPs are co-located with Vehicle Dismantling... -
Vehicle Dismantling Facilities
Vehicle Dismantling Facilities (VDF) take in end-of-life vehicles and recover materials from them for reuse and recycling. These materials include scrap metal, gasoline, oil,... -
Regulatory Tidal Wetlands
Tidal wetlands in New York State are found on the Hudson River from the Troy Dam south to the southern tip of Staten Island, and along the entire shoreline of Long Island,... -
NYS Regions for Productive Vernal Pools
The Major Regions of NYS Productive Vernal Pools layer provides the boundaries for the five major regions of New York State corresponding with the Productive Vernal Pools... -
Boat Launches
Hand launch and trailer launch sites administered by the DEC and other entities. Locations that are accessible are denoted by icons that have blue outlines. For background... -
Previously Mapped Freshwater Wetlands
The Freshwater Wetlands Act changed in 2022 such that wetlands greater than 12.4 acres in size are regulated regardless of their mapping status. In addition to larger wetlands,... -
Significant Flooding HUC12 Watersheds
The Significant Flooding HUC 12 Watersheds layer includes all HUC 12 watersheds meeting all three Significant Flooding criteria identified under 6 NYCRR Part 664(a). For layer... -
Water Withdrawal Annual Reports
Facilities that have the capacity to withdraw 100,000 gallons or more of water per day must report water use annually to DEC. Facility locations shown are generally the... -
ECO Contacts
ECO Contacts Division of Law Enforcement (DLE) Boundaries, and the name of the ECO responsible for that zone. Available information includes the ECO’s phone number and the name... -
Inactive Solid Waste Landfills
This data layer identifies all inactive landfills in New York State with known locations. For background information, see Solid Waste Management Facilities For layer information... -
Radiation Control Permit Facilities
Locations and details of facilities that have Radiation Control Permits which control the release of radioactive material to the environment. For background information, see... -
Wildlife Management Areas
Polygons needed to create maps of Wildlife Management Areas. There are more than 130 WMAs comprising more than 225,000 acres statewide. The WMA system protects and manages... -
Forest Ranger Contact
Forest Rangers are assigned to territories where they are responsible for the preservation, protection, and enhancement of the state's forest resources, as well as the safety... -
Major Oil Storage Facility
The MOSF program applies to facilities that store a total of 400,000 gallons or more of petroleum in aboveground and underground storage tanks. Facilities must be licensed by... -
Air Quality Monitoring Sites
Air quality monitoring sites measure for criteria air pollutants and other public health-related contaminants. An Air Quality Index meter shows general air quality. Not all... -
Air Title V Permits ATV
Title V Permits are issued to facilities that are major sources of air emissions. These facilities are usually considered to be the largest in the state and meet the criteria of... -
Air State Facility Permits ASF
State Facility Permits are issued to facilities considered to be mid-sized. They have lower potential emissions, fewer permit requirements than Title V facilities, and they meet...