-
LADWP Power Poles Replaced
Cumulative number of poles replaced annually (fiscal year) under the LADWP Power System Reliability Program -
MTA Subway Terminal On-Time Performance: Beginning 2025
Terminal On-Time Performance measures the percentage of trains arriving at their destination terminals as scheduled. -
MTA Bus Wait Assessment: 2020 - 2024
Wait Assessment measures how evenly buses are spaced. Additional years of data are available in separate datasets on data.ny.gov. -
MTA LIRR Delays (Archived Methodology): 2015 - 2022
This deprecated dataset contains information on LIRR Systemwide Delays using reporting categories that were active from 2015 to 2022. More up-to-date and granular information on... -
MTA LIRR On-Time Performance: Beginning 2015
On-Time Performance (OTP) determines how frequently a commuter train arrives at its final destination within 5 minutes and 59 seconds of its scheduled time. -
MTA Bus Wait Assessment: Beginning 2025
Wait Assessment measures how evenly buses are spaced. -
MTA Subway Major Incidents: 2015-2019
Major Incidents are unplanned incidents that delay 50 or more trains, which cause the most disruption to customers. This dataset covers data between 2015 and 2019. For data from... -
MTA NYCT Paratransit Max Ride Time Performance: 2018 - 2023
Max Ride Time Performance presents the percentage of trips performed with Access-A-Ride’s established max ride time standards between 2018 and 2023. This dataset is now retired... -
MTA NYCT Paratransit Provider No-Shows: Beginning 2016
This metric measures the frequency with which primary providers do not arrive at the pick-up location within 30 minutes of the promised time and the trip is not provided.
E' possibile inoltre accedere al registro usando le API (vedi Documentazione API).