9A Injection: June 28 thru July 23, 2018

Processed Gladwin Tensor Strainmeter, eddy current vertical strain and tilt, optical fiber areal strainmeter, and well pressure and injection rate data from the well 9A injection on June 28 thru July 23, 2017, at the North Avant Field, OK

Data and Resources

Field Value
Citation "Lawrence C. Murdoch and Scott DeWolf, 9A Injection: June 28 thru July 23, 2018, 2019-04-06, https://edx.netl.doe.gov/dataset/9a-injection-june-2018"
Is NETL associated "Yes"
NETL Point of Contact "Stephen Henry"
NETL Point of Contact's Email "Stephen.Henry@netl.doe.gov"
NETL program or project "Characterizing and Interpreting the In Situ Strain Tensor During CO2 Injection"
Groups
  • AmeriGEOSS
  • Global Provider
Tags
  • amerigeo
  • amerigeoss
  • ckan
  • edx
  • energy
  • energy-data-exchange
  • geo
  • geologic-carbon-storage
  • geomechanics
  • geoss
  • global
isopen False
metadata_created 2025-11-25T21:42:30.285084
metadata_modified 2025-11-25T21:42:30.285088
notes Processed Gladwin Tensor Strainmeter, eddy current vertical strain and tilt, optical fiber areal strainmeter, and well pressure and injection rate data from the well 9A injection on June 28 thru July 23, 2017, at the North Avant Field, OK
num_resources 7
num_tags 11
title 9A Injection: June 28 thru July 23, 2018