SECARB Daily Operations and Progress Reports
Monthly and quarterly technical progress reports, daily summaries of field activities, and overall progress of SECARB project from the Gulf Coast Carbon Center. Some folders may... -
Determination of Optimum Air (Gas) Injection Rate in Aerated Drilling...
Determination of Optimum Air (Gas) Injection Rate in Aerated Drilling Operations, Annual Report; May 1, 1979-April 30, 1980 -
Operational Performance Requirements For Motor Power Sections Used in...
Operational performance requirements are needed to support development of specifications for downhole motor power sections to be used for drilling hard rock during geothermal... -
Utah FORGE: Well 16A(78)-32 Drilling Data
This dataset includes survey data, drilling data, daily reports, summaries of daily operations, and rig photos from the drilling of Utah FORGE well 16A(78)-32, which is a highly... -
GOOML Big Kahuna Forecast Modeling and Genetic Optimization Files
This submission includes example files associated with the Geothermal Operational Optimization using Machine Learning (GOOML) Big Kahuna fictional power plant, which uses... -
Utah FORGE Phase 3A, Year 2, Annual Report
This is the annual report for Utah FORGE Phase 3A, year two, which was published on July 28th, 2022. The report includes site infrastructure, site operations, seismic monitoring... -
GOOML Big Kahuna Forecast Modeling and Genetic Optimization Files
This submission includes example files associated with the Geothermal Operational Optimization using Machine Learning (GOOML) Big Kahuna fictional power plant, which uses... -
Community Geothermal: Planning and Design of a Heating and Cooling System in...
These reports, plans, and drawings review the achievements of Home Energy Efficiency Team (HEET) and its partners to plan and design a network of interconnected ground-source... -
Utah FORGE: Daily Reports for the 2024 Stimulation of Wells 16A/16B(78)-32
The zip file below contains daily reports produced during the spring 2024 stimulation of wells 16A/16B(78)-32 at Utah FORGE . These reports cover a period from March 29th to...