Community Geothermal: Planning and Design of a Heating and Cooling System in Framingham, Massachusetts
Data and Resources
-
Permitting Plan.pdfPDF
Permitting plan for geothermal networks in Framingham, Massachusetts .
-
Design Drawings.pdfPDF
Design Drawings for a Geothermal Network in Framingham, Massachusetts. The...
-
Environmental Justice Considerations.pdfPDF
This report presents the environmental justice (EJ) considerations that...
-
Operations and Maintenance Strategy.pdfPDF
This report describes the operations and maintenance (O&M) strategy for...
-
Monitoring and Metering Plan.pdfPDF
This report describes the metering and monitoring strategy for geothermal...
-
Stakeholder Design Considerations.pdfPDF
This report describes the stakeholder considerations that should be taken...
| Field | Value |
|---|---|
| DOI | 10.15121/2448376 |
| accessLevel | public |
| bureauCode | {019:20} |
| catalog_@context | https://openei.org/data.json |
| catalog_@id | https://openei.org/data.json |
| catalog_conformsTo | https://project-open-data.cio.gov/v1.1/schema |
| catalog_describedBy | https://project-open-data.cio.gov/v1.1/schema/catalog.json |
| dataQuality | true |
| datagov_dedupe_retained | 20250120171954 |
| identifier | https://data.openei.org/submissions/7736 |
| issued | 2024-09-01T06:00:00Z |
| landingPage | https://gdr.openei.org/submissions/1672 |
| license | https://creativecommons.org/licenses/by/4.0/ |
| modified | 2024-10-01T15:41:22Z |
| old-spatial | {"type":"Polygon","coordinates":[[[-71.67332382812504,42.17175287550966],[-71.08562832031248,42.17175287550966],[-71.08562832031248,42.43503205786246],[-71.67332382812504,42.43503205786246],[-71.67332382812504,42.17175287550966]]]} |
| programCode | {019:006} |
| projectLead | Arlene Anderson |
| projectNumber | EE0010662 |
| projectTitle | Building a utility-managed geothermal network in Framingham, Massachusetts and exploring options to integrate renewable energy elements |
| publisher | Home Energy Efficiency Team (HEET) |
| resource-type | Dataset |
| source_datajson_identifier | true |
| source_hash | 3ed0e3f6ad1c9dfe05299163bad386cd7508683d3339e2b2fb6fd8d36f0db35a |
| source_schema_version | 1.1 |
| spatial | {"type":"Polygon","coordinates":[[[-71.67332382812504,42.17175287550966],[-71.08562832031248,42.17175287550966],[-71.08562832031248,42.43503205786246],[-71.67332382812504,42.43503205786246],[-71.67332382812504,42.17175287550966]]]} |
| Groups |
|
| Tags |
|
| isopen | True |
| license_id | cc-by |
| license_title | Creative Commons Attribution |
| license_url | http://www.opendefinition.org/licenses/cc-by |
| maintainer | Isabel Varela Gutierrez |
| maintainer_email | isabel.varela@heet.org |
| metadata_created | 2025-09-24T19:13:32.865586 |
| metadata_modified | 2025-09-24T19:13:32.865595 |
| notes | These reports, plans, and drawings review the achievements of Home Energy Efficiency Team (HEET) and its partners to plan and design a network of interconnected ground-source heat pump systems, or geothermal network, in an area encompassing multiple environmental justice (EJ) neighborhoods in the City of Framingham, MA. The materials provided in this dataset include, a) stakeholder and design best practices, b) study on optimal method to interconnect geothermal loops, c) guidelines for monitoring and metering, d) operations and maintenance plans, e) permitting guidelines and f) 10-day driller tutorial curriculum. These materials can guide the efficient and ethical design of future geothermal networks nationwide. The capacity of the system is estimated at 217 tons and is designed to provide 100% of heating and cooling needs for the buildings connected to the loop. In this project, 80 boreholes are used as the main thermal resources, the distribution system (or loop) consists of 0.61 miles of an 8-inch single-pipe at ambient temperature, with the capacity to connect 44 buildings, including 13 apartment buildings from the Framingham Housing Authority, one transitional home, one school building and 29 single family homes. While Framingham already has a geothermal network loop that is currently in the commissioning stage, our proposed project is unique because it is the first utility-led expansion loop (2nd loop) project that will connect to an adjacent existing geothermal loop (1st loop) in a pre-existing neighborhood. Both the 1st and 2nd loops are being installed, owned and operated by Eversource Energy, the utility Deployment Partner. |
| num_resources | 6 |
| num_tags | 31 |
| title | Community Geothermal: Planning and Design of a Heating and Cooling System in Framingham, Massachusetts |