Applications of stochastic optimization, Task 4

This report illustrates the power of the new stochastic optimization and stochastic programming capabilities developed around the ASPEN simulator in solving various types of design and analysis problems for advanced energy systems. A case study is presented for the Lurgi air-blown dry ash gasifier IGCC system. In addition the stochastic optimization capability can also be used for off-line quality control. The methodology is presented in the context of a simple gas turbine combustor flowsheet.

Data and Resources

Field Value
Citation "\"NONE\""
Is NETL associated "\"Yes\""
NETL Point of Contact "\"Roy Long\""
NETL Point of Contact's Email "\"Roy.long@netl.doe.gov\""
NETL program or project "\"KMD\""
Publication Date "\"12/1/1994\""
Groups
  • AmeriGEOSS
  • Global Provider
Tags
  • amerigeo
  • amerigeoss
  • ckan
  • edx
  • energy
  • energy-data-exchange
  • geo
  • geoss
  • global
  • kmd
isopen True
license_id other-open
license_title Other (Open)
metadata_created 2025-11-25T23:07:20.199813
metadata_modified 2025-11-25T23:07:20.199816
notes This report illustrates the power of the new stochastic optimization and stochastic programming capabilities developed around the ASPEN simulator in solving various types of design and analysis problems for advanced energy systems. A case study is presented for the Lurgi air-blown dry ash gasifier IGCC system. In addition the stochastic optimization capability can also be used for off-line quality control. The methodology is presented in the context of a simple gas turbine combustor flowsheet.
num_resources 1
num_tags 10
title Applications of stochastic optimization, Task 4