BASALT WASTE ISOLATION PROJECT SYSTEM ENGINEERING & MANAGEMENT PLAN

"The System Engineering Management Plan (SEM~ sets forth the requirements for the implementation and management of system engineering in the BWI Project during the site characterization phase. The requirements of the SEMP are applicable to BWI Division design development and siting activities and to all contractors and Federal agencies supporting those activities. The SEMP defines: o The system engineering process which will be used. o Policy and procedural issues ...which have application across the technical program. o Responsibilities and methodologies for implementation of the BWIP system engineering process including reviews, integration and quality requirements. o Document preparation responsibilities and approval/acceptance authority. o The relationships between technical documents, and the content and change control of documents and data bases."

Data and Resources

Field Value
Citation "\"E.H. Petrie\""
Is NETL associated "\"Yes\""
NETL Point of Contact "\"Roy Long\""
NETL Point of Contact's Email "\"Roy.long@netl.doe.gov\""
NETL program or project "\"KMD\""
Publication Date "\"11/1/1986\""
Groups
  • AmeriGEOSS
  • Global Provider
Tags
  • amerigeo
  • amerigeoss
  • ckan
  • edx
  • energy
  • energy-data-exchange
  • geo
  • geoss
  • global
  • kmd
isopen True
license_id other-open
license_title Other (Open)
metadata_created 2025-11-25T22:55:08.714566
metadata_modified 2025-11-25T22:55:08.714570
notes "The System Engineering Management Plan (SEM~ sets forth the requirements for the implementation and management of system engineering in the BWI Project during the site characterization phase. The requirements of the SEMP are applicable to BWI Division design development and siting activities and to all contractors and Federal agencies supporting those activities. The SEMP defines: o The system engineering process which will be used. o Policy and procedural issues ...which have application across the technical program. o Responsibilities and methodologies for implementation of the BWIP system engineering process including reviews, integration and quality requirements. o Document preparation responsibilities and approval/acceptance authority. o The relationships between technical documents, and the content and change control of documents and data bases."
num_resources 1
num_tags 10
title BASALT WASTE ISOLATION PROJECT SYSTEM ENGINEERING & MANAGEMENT PLAN