Engineer, design, construct, test and evaluate a pressurized fluidized bed pilot plant using high sulfur coal for production of electric power. Phase III. Pilot plant construction. Quarterly report for the period September 1-November 30, 1981

Progress in the design, construction, testing and evaluation of a pressurized fluidized bed pilot plant is reported. The initial layout of the main control panel arrangement was completed. Refinements to the front panel equipment arrangement and designation of cable penetration locations are in progress. Parts and materials have been specified and are being procured. Engineering design of the process piping has been completed and fabrication is awaiting FY 82 funding. The replacement ASTM A105 material flanges for the air exchange housing have been successfully welded to the stainless steel 409 housings. Fabrication of the air exchange housing is continuing on schedule. Heat exchange tube fabrication at Curtiss-Wright continues on schedule. A significant quantity of the material handling equipment has been received at site with the remainder scheduled for delivery in December/January. Initial review of the hot gas cleanup collector design drawings has been completed.

Data and Resources

Field Value
Citation "\"Not Available\""
Is NETL associated "\"Yes\""
NETL Point of Contact "\"Roy Long\""
NETL Point of Contact's Email "\"Roy.long@netl.doe.gov\""
NETL program or project "\"KMD\""
Publication Date "\"1/1/1981\""
Groups
  • AmeriGEOSS
  • Global Provider
Tags
  • amerigeo
  • amerigeoss
  • ckan
  • edx
  • energy
  • energy-data-exchange
  • geo
  • geoss
  • global
  • kmd
isopen True
license_id other-open
license_title Other (Open)
metadata_created 2025-11-25T23:00:55.444438
metadata_modified 2025-11-25T23:00:55.444443
notes Progress in the design, construction, testing and evaluation of a pressurized fluidized bed pilot plant is reported. The initial layout of the main control panel arrangement was completed. Refinements to the front panel equipment arrangement and designation of cable penetration locations are in progress. Parts and materials have been specified and are being procured. Engineering design of the process piping has been completed and fabrication is awaiting FY 82 funding. The replacement ASTM A105 material flanges for the air exchange housing have been successfully welded to the stainless steel 409 housings. Fabrication of the air exchange housing is continuing on schedule. Heat exchange tube fabrication at Curtiss-Wright continues on schedule. A significant quantity of the material handling equipment has been received at site with the remainder scheduled for delivery in December/January. Initial review of the hot gas cleanup collector design drawings has been completed.
num_resources 1
num_tags 10
title Engineer, design, construct, test and evaluate a pressurized fluidized bed pilot plant using high sulfur coal for production of electric power. Phase III. Pilot plant construction. Quarterly report for the period September 1-November 30, 1981