EPOXI MARS OBS - HRIV CALIBRATED IMAGES V1.0

This data set contains calibrated narrow band filter images (350-950 nm) images of Mars acquired by the Deep Impact High Resolution Visible CCD (HRIV) for the EPOCh project during the second cruise phase of the EPOXI mission. One set of observations was acquired on 20-21 November 2009 to characterize Mars as an analog for extrasolar planets. The observing period lasted approximately 24 hours. HRIV images were acquired once per hour with the filters centered on 350, 750 and 950 nm, whereas the 450-, 550-, 650-, and 850-nm data were taken every 15 minutes.

Data and Resources

This dataset has no data

Field Value
accessLevel public
accrualPeriodicity irregular
bureauCode {026:00}
catalog_@context https://project-open-data.cio.gov/v1.1/schema/catalog.jsonld
catalog_conformsTo https://project-open-data.cio.gov/v1.1/schema
catalog_describedBy https://project-open-data.cio.gov/v1.1/schema/catalog.json
identifier urn:nasa:pds:context_pds3:data_set:data_set.dif-m-hriv-3-4-epoxi-mars-v1.0_5f7w-wggg
issued 2018-06-26
landingPage https://pds.nasa.gov/ds-view/pds/viewDataset.jsp?dsid=DIF-M-HRIV-3%2F4-EPOXI-MARS-V1.0
modified 2025-07-17
programCode {026:005}
publisher National Aeronautics and Space Administration
references {https://pds.nasa.gov}
resource-type Dataset
source_datajson_identifier true
source_hash b31bb1190adadcd3ba658df81ffd3b5b6722b6a8c87268820f039768f8baf569
source_schema_version 1.1
theme {"Earth Science"}
Groups
  • AmeriGEOSS
  • National Provider
  • North America
Tags
  • AmeriGEO
  • AmeriGEOSS
  • CKAN
  • GEO
  • GEOSS
  • National
  • North America
  • United States
  • epoxi
  • mars
isopen False
license_id notspecified
license_title License not specified
maintainer Thomas Morgan
maintainer_email thomas.h.morgan@nasa.gov
metadata_created 2025-09-23T15:34:11.182216
metadata_modified 2025-09-23T15:34:11.182223
notes This data set contains calibrated narrow band filter images (350-950 nm) images of Mars acquired by the Deep Impact High Resolution Visible CCD (HRIV) for the EPOCh project during the second cruise phase of the EPOXI mission. One set of observations was acquired on 20-21 November 2009 to characterize Mars as an analog for extrasolar planets. The observing period lasted approximately 24 hours. HRIV images were acquired once per hour with the filters centered on 350, 750 and 950 nm, whereas the 450-, 550-, 650-, and 850-nm data were taken every 15 minutes.
num_resources 0
num_tags 10
title EPOXI MARS OBS - HRIV CALIBRATED IMAGES V1.0