Gas turbine component screening program: fuel flexible combustor

An advanced two stage coal-water mixture, high-pressure gas turbine combustion system has been designed and built. The combustor is a 1/10 scale in volume of that required for the Solar Model H Centaur gas turbine engine. It features a rich primary zone, lean secondary zone with hot refractory walls in both zones. Molten slag removal is accomplished inertially using a form of jet impaction. The primary and secondary air flows are supplied separately which allows precise control and measurement of zonal equivalence ratios and flow splits. A description of each component of the combustion system is presented along with a discussion of the suggested theory of operation. The test setup and instrumentation are also described. 13 figs., 4 tabs.

Data and Resources

Field Value
Citation "\"LeCren, R.T.\""
Is NETL associated "\"Yes\""
NETL Point of Contact "\"Roy Long\""
NETL Point of Contact's Email "\"Roy.long@netl.doe.gov\""
NETL program or project "\"KMD\""
Publication Date "\"1/1/1986\""
Groups
  • AmeriGEOSS
  • Global Provider
Tags
  • amerigeo
  • amerigeoss
  • ckan
  • edx
  • energy
  • energy-data-exchange
  • geo
  • geoss
  • global
  • kmd
isopen True
license_id other-open
license_title Other (Open)
metadata_created 2025-11-25T22:33:46.467333
metadata_modified 2025-11-25T22:33:46.467337
notes An advanced two stage coal-water mixture, high-pressure gas turbine combustion system has been designed and built. The combustor is a 1/10 scale in volume of that required for the Solar Model H Centaur gas turbine engine. It features a rich primary zone, lean secondary zone with hot refractory walls in both zones. Molten slag removal is accomplished inertially using a form of jet impaction. The primary and secondary air flows are supplied separately which allows precise control and measurement of zonal equivalence ratios and flow splits. A description of each component of the combustion system is presented along with a discussion of the suggested theory of operation. The test setup and instrumentation are also described. 13 figs., 4 tabs.
num_resources 1
num_tags 10
title Gas turbine component screening program: fuel flexible combustor