HydroPulse System Test (Chehalis-I)

The first full-flow tests of the HydroPulse system were carried out on December 1, 1999 at Taylor Drilling near Chehalis Washington. The objective of full-flow testing is to evaluate tool reliability in a realistic environment. The tests were carried out at full flow inside a pressurized length of tubing. Specific test objectives, test setup, instrumentation and test results are discussed below.

Data and Resources

Field Value
Citation "\"NULL\""
Is NETL associated "\"Yes\""
NETL Point of Contact "\"Roy Long\""
NETL Point of Contact's Email "\"Roy.long@netl.doe.gov\""
NETL program or project "\"KMD\""
Publication Date "\"1/21/2000\""
Groups
  • AmeriGEOSS
  • Global Provider
Tags
  • amerigeo
  • amerigeoss
  • ckan
  • edx
  • energy
  • energy-data-exchange
  • geo
  • geoss
  • global
  • kmd
isopen True
license_id other-open
license_title Other (Open)
metadata_created 2025-11-25T22:59:19.658271
metadata_modified 2025-11-25T22:59:19.658275
notes The first full-flow tests of the HydroPulse system were carried out on December 1, 1999 at Taylor Drilling near Chehalis Washington. The objective of full-flow testing is to evaluate tool reliability in a realistic environment. The tests were carried out at full flow inside a pressurized length of tubing. Specific test objectives, test setup, instrumentation and test results are discussed below.
num_resources 1
num_tags 10
title HydroPulse System Test (Chehalis-I)