HydroPulse System Test (Chehalis-I)
Data and Resources
| Field | Value |
|---|---|
| Citation | "\"NULL\"" |
| Is NETL associated | "\"Yes\"" |
| NETL Point of Contact | "\"Roy Long\"" |
| NETL Point of Contact's Email | "\"Roy.long@netl.doe.gov\"" |
| NETL program or project | "\"KMD\"" |
| Publication Date | "\"1/21/2000\"" |
| Groups |
|
| Tags |
|
| isopen | True |
| license_id | other-open |
| license_title | Other (Open) |
| metadata_created | 2025-11-25T22:59:19.658271 |
| metadata_modified | 2025-11-25T22:59:19.658275 |
| notes | The first full-flow tests of the HydroPulse system were carried out on December 1, 1999 at Taylor Drilling near Chehalis Washington. The objective of full-flow testing is to evaluate tool reliability in a realistic environment. The tests were carried out at full flow inside a pressurized length of tubing. Specific test objectives, test setup, instrumentation and test results are discussed below. |
| num_resources | 1 |
| num_tags | 10 |
| title | HydroPulse System Test (Chehalis-I) |