ICA Sudan, 2018 - Flood Risk, 2013

This layer contains information about the flood risk - by second-level administrative area - estimated during the Integrated Context Analysis (ICA) run in Sudan in 2018. Data sources: UNEP/UNISDR, GAR 2013. The main indicators used for the analysis were the percentage of district surface at flood risk and the maximum expected frequency of flood events with a 100-year return period.

Data and Resources

Field Value
access_constraints []
bbox-east-long 38.590925744153
bbox-north-lat 23.1428628542098
bbox-south-lat 8.64454777993055
bbox-west-long 21.8131571467325
contact-email stefano.cairo@wfp.org
coupled-resource []
dataset-reference-date [{"type": "publication", "value": "2018-11-22T13:47:00Z"}]
graphic-preview-description Thumbnail for 'ICA Sudan, 2018 - Flood Risk, 2013'
graphic-preview-file https://geonode.wfp.org/uploaded/thumbs/layer-bc0d4186-ee54-11e8-8621-005056822e38-thumb.png
graphic-preview-type image/png
guid bc0d4186-ee54-11e8-8621-005056822e38
licence []
metadata-date 2018-11-22T13:49:26Z
progress completed
resource-type dataset
responsible-party [{"name": "WFP", "roles": ["pointOfContact"]}]
spatial {"type": "Polygon", "coordinates": [[[21.8131571467, 8.64454777993], [38.5909257442, 8.64454777993], [38.5909257442, 23.1428628542], [21.8131571467, 23.1428628542], [21.8131571467, 8.64454777993]]]}
spatial-reference-system 4326
spatial_harvester true
Tags
  • AfriGEOSS
  • AmeriGEO
  • AmeriGEOSS
  • EuroGEOSS
  • Food Security
  • GEO
  • GEOSS
  • GIS
  • GeoNode
  • Geospatial
  • Global
  • Sudan
  • United Nations
  • WFP
  • World Food Program
  • flood
  • ica_2018
isopen False
metadata_created 2025-09-30T20:44:59.770310
metadata_modified 2025-09-30T20:44:59.770318
notes This layer contains information about the flood risk - by second-level administrative area - estimated during the Integrated Context Analysis (ICA) run in Sudan in 2018. Data sources: UNEP/UNISDR, GAR 2013. The main indicators used for the analysis were the percentage of district surface at flood risk and the maximum expected frequency of flood events with a 100-year return period.
num_resources 18
num_tags 17
title ICA Sudan, 2018 - Flood Risk, 2013