Lockheed D-6H: Preliminary report

The assessment of the D-6H conducted at the Lockheed Martin facility was limited in its scope. The scope of the assessment was directed by the type of equipment being used and the amount of accessibility to the equipment. Due to severe time constraints--the assessment was conducted in one day--human factor interface activities were limited. This report covers aspects of the technology that were available to the assessment team. Recommendations for future evaluation of this technology are also included.

Data and Resources

Field Value
Citation "\"NONE\""
Is NETL associated "\"Yes\""
NETL Point of Contact "\"Roy Long\""
NETL Point of Contact's Email "\"Roy.long@netl.doe.gov\""
NETL program or project "\"KMD\""
Publication Date "\"7/31/1997\""
Groups
  • AmeriGEOSS
  • Global Provider
Tags
  • amerigeo
  • amerigeoss
  • ckan
  • edx
  • energy
  • energy-data-exchange
  • geo
  • geoss
  • global
  • kmd
isopen True
license_id other-open
license_title Other (Open)
metadata_created 2025-11-25T22:53:30.399804
metadata_modified 2025-11-25T22:53:30.399808
notes The assessment of the D-6H conducted at the Lockheed Martin facility was limited in its scope. The scope of the assessment was directed by the type of equipment being used and the amount of accessibility to the equipment. Due to severe time constraints--the assessment was conducted in one day--human factor interface activities were limited. This report covers aspects of the technology that were available to the assessment team. Recommendations for future evaluation of this technology are also included.
num_resources 1
num_tags 10
title Lockheed D-6H: Preliminary report