Long-term materials-test program: qualifications assessment and second annual report

The Long Term Materials Test has been built, shaken down, and tested extensively during the last year, fiscal 1981. Startup and operating procedures have been established and the rig is now ready for long term testing. A fully instrumented and monitored Qualification Test has established that the PFB rig can provide 90% sulfur capture, acceptable dust load, and 1600/sup 0/F combustion products at the low velocity test section (without supplemental gas firing). The rig operates as designed.

Data and Resources

Field Value
Citation "\"Not Available\""
Is NETL associated "\"Yes\""
NETL Point of Contact "\"Roy Long\""
NETL Point of Contact's Email "\"Roy.long@netl.doe.gov\""
NETL program or project "\"KMD\""
Publication Date "\"1/1/1981\""
Groups
  • AmeriGEOSS
  • Global Provider
Tags
  • amerigeo
  • amerigeoss
  • ckan
  • edx
  • energy
  • energy-data-exchange
  • geo
  • geoss
  • global
  • kmd
isopen True
license_id other-open
license_title Other (Open)
metadata_created 2025-11-25T21:22:09.008333
metadata_modified 2025-11-25T21:22:09.008337
notes The Long Term Materials Test has been built, shaken down, and tested extensively during the last year, fiscal 1981. Startup and operating procedures have been established and the rig is now ready for long term testing. A fully instrumented and monitored Qualification Test has established that the PFB rig can provide 90% sulfur capture, acceptable dust load, and 1600/sup 0/F combustion products at the low velocity test section (without supplemental gas firing). The rig operates as designed.
num_resources 1
num_tags 10
title Long-term materials-test program: qualifications assessment and second annual report