Pacific Project. Phase 2 Quality Assurance Plan, Task 12

The Superior Oil Company, the Sohio Oil Company, and the Cleveland Cliffs Iron Company propose to construct and operate a shale oil production facility in Garfield County, Colorado. The proposed facility would consist of an oil shale retorting module, an associated room-and-pillar mine, and necessary auxiliary and support facilities. Construction would be contracted to qualified and reputable companies who would be required to purchase, assemble, test, and assure quality of the work they, their subcontractors, and their suppliers perform. To insure that work and materials utilized on this project would be of the quality necessary for the successful operation of the production facility, a detailed Quality Assurance Plan would be developed. The basis for the Quality Assurance Plan would be compliance with all federal, state, county, and local codes which would apply to the plant and construction activities. In addition, The Superior Oil Company's Engineering Standards Manual specifies the minium acceptable standards for components allowed in a Superior capital project. Before actual construction begins the contractor would be supplied with the Quality Assurance Manual. The manual includes the Engineering Standards, as well as, the Design Data Book, The Superior Oil Company Construction Manual, and the Coordination Procedures Manual. The compilation of documents exactly specifies the work to be performed, standards which the work must meet, quality of materials used, and testing and inspection of the facilities as work progresses. In order to insure the quality of the work being performed, a Quality Assurance Group would be formed. This group would monitor the construction progress, be present during testing and inspection of plant components, spot check job performance, and insure the contractor's compliance with quality assurance.

Data and Resources

Field Value
Citation "\"Not Available\""
Is NETL associated "\"Yes\""
NETL Point of Contact "\"Roy Long\""
NETL Point of Contact's Email "\"Roy.long@netl.doe.gov\""
NETL program or project "\"KMD\""
Publication Date "\"2/1/1983\""
Groups
  • AmeriGEOSS
  • Global Provider
Tags
  • amerigeo
  • amerigeoss
  • ckan
  • edx
  • energy
  • energy-data-exchange
  • geo
  • geoss
  • global
  • kmd
isopen True
license_id other-open
license_title Other (Open)
metadata_created 2025-11-25T21:04:00.601214
metadata_modified 2025-11-25T21:04:00.601219
notes The Superior Oil Company, the Sohio Oil Company, and the Cleveland Cliffs Iron Company propose to construct and operate a shale oil production facility in Garfield County, Colorado. The proposed facility would consist of an oil shale retorting module, an associated room-and-pillar mine, and necessary auxiliary and support facilities. Construction would be contracted to qualified and reputable companies who would be required to purchase, assemble, test, and assure quality of the work they, their subcontractors, and their suppliers perform. To insure that work and materials utilized on this project would be of the quality necessary for the successful operation of the production facility, a detailed Quality Assurance Plan would be developed. The basis for the Quality Assurance Plan would be compliance with all federal, state, county, and local codes which would apply to the plant and construction activities. In addition, The Superior Oil Company's Engineering Standards Manual specifies the minium acceptable standards for components allowed in a Superior capital project. Before actual construction begins the contractor would be supplied with the Quality Assurance Manual. The manual includes the Engineering Standards, as well as, the Design Data Book, The Superior Oil Company Construction Manual, and the Coordination Procedures Manual. The compilation of documents exactly specifies the work to be performed, standards which the work must meet, quality of materials used, and testing and inspection of the facilities as work progresses. In order to insure the quality of the work being performed, a Quality Assurance Group would be formed. This group would monitor the construction progress, be present during testing and inspection of plant components, spot check job performance, and insure the contractor's compliance with quality assurance.
num_resources 1
num_tags 10
title Pacific Project. Phase 2 Quality Assurance Plan, Task 12