DOE has formulated an active research, development, and pilot program for PFBC. The program is designed to develop the technology and data base necessary for successful commercialization of the PFBC concept. The DOE program strategy is based on an orderly progression of exploratory research, process development, and engineering development phases. One aspect of the PFBC program strategy is to encourage private-sector participation in the R and D process, with DOE assuming more risk in the early stages of development. Current DOE activity in the pressurized boiler (steam-cycle) regime centers on participation in the IEA-Grimethorpe pilot plant project in England. Construction and commissioning of the pilot plant is complete, and the first series of testing was completed in December 1981. Performance testing on US coals and UK coals continues. The current status of PFB technology may be summarized as follows: Turbine erosion tolerance and hot-gas cleanup are still barriers; promising turbine corrosion-resistant materials have been identified; first-generation PFBC technology development is maturing at the PDU level, and a comprehensive data base for private-sector reference concerning application of the technology is becoming available; and in-bed heat exchanger materials have been identified, but further long-term exposure data are required. The DOE PFBC R and D programs are directed at the resolution of these key technical issues. 56 refs., 10 figs., 8 tabs.