Program reference schedule baseline

The Program Reference Schedule Baseline is required by the Program Management System Manual. The PRSB is one of three documents that constitute the Program-level baseline. The other two are the Program Reference Cost Baseline and the waste management system requirements and description document.

Data and Resources

Field Value
Citation ""
Is NETL associated "\"Yes\""
NETL Point of Contact "\"Roy Long\""
NETL Point of Contact's Email "\"Roy.long@netl.doe.gov\""
NETL program or project "\"KMD\""
Publication Date "\"7/1/1986\""
Groups
  • AmeriGEOSS
  • Global Provider
Tags
  • amerigeo
  • amerigeoss
  • ckan
  • edx
  • energy
  • energy-data-exchange
  • geo
  • geoss
  • global
  • kmd
isopen True
license_id other-open
license_title Other (Open)
metadata_created 2025-11-25T22:39:15.832729
metadata_modified 2025-11-25T22:39:15.832733
notes The Program Reference Schedule Baseline is required by the Program Management System Manual. The PRSB is one of three documents that constitute the Program-level baseline. The other two are the Program Reference Cost Baseline and the waste management system requirements and description document.
num_resources 1
num_tags 10
title Program reference schedule baseline