Prototype lockhopper valve test plan

This document has been prepared to summarize the overall plan for testing prototype lockhopper valves being developed by Fairchild Industries and Consolidated Controls Corporation under contract to DOE/FE. The testing effort described will establish the capability of these valves to meet the design criteria contained in Design Criteria for Lockhopper Valve Development, METC/SP-78/3. The design criteria was based on the requirements of the Lockhopper Valve RFP 1813, analysis of those coal conversion processes that are most promising for demonstration plants, and a desire for valve life comparable with other gasification plant equipment. The test plan was prepared with inputs from, and in cooperation with, Fossil Energy Research and Morgantown Energy Technology Center personnel and was originally published on December 30, 1976, under Fossil Energy Report FE 2213-016-09 by TRW Energy Systems Group.

Data and Resources

Field Value
Citation "\"Gardner, J.F.; Freeburn, F.D.\""
Is NETL associated "\"Yes\""
NETL Point of Contact "\"Roy Long\""
NETL Point of Contact's Email "\"Roy.long@netl.doe.gov\""
NETL program or project "\"KMD\""
Publication Date "\"3/1/1979\""
Groups
  • AmeriGEOSS
  • Global Provider
Tags
  • amerigeo
  • amerigeoss
  • ckan
  • edx
  • energy
  • energy-data-exchange
  • geo
  • geoss
  • global
  • kmd
isopen True
license_id other-open
license_title Other (Open)
metadata_created 2025-11-25T22:55:41.956193
metadata_modified 2025-11-25T22:55:41.956196
notes This document has been prepared to summarize the overall plan for testing prototype lockhopper valves being developed by Fairchild Industries and Consolidated Controls Corporation under contract to DOE/FE. The testing effort described will establish the capability of these valves to meet the design criteria contained in Design Criteria for Lockhopper Valve Development, METC/SP-78/3. The design criteria was based on the requirements of the Lockhopper Valve RFP 1813, analysis of those coal conversion processes that are most promising for demonstration plants, and a desire for valve life comparable with other gasification plant equipment. The test plan was prepared with inputs from, and in cooperation with, Fossil Energy Research and Morgantown Energy Technology Center personnel and was originally published on December 30, 1976, under Fossil Energy Report FE 2213-016-09 by TRW Energy Systems Group.
num_resources 1
num_tags 10
title Prototype lockhopper valve test plan