Research and development program on the disposal of retorted oil shale; Paraho Oil Shale Project. Laboratory tests on retorted shale from the direct heated semi-works plant. Interim report 13 Feb--24 Oct 1975, on Phase 4, Part 1

A preliminary program dated April 25, 1974, was prepared for Development Engineering, Inc. (DEI) on research and development, for laboratory, field and other engineering studies on the disposal of retorted oil shale. This program was revised and published as a final document dated December 17, 1974. The document included discussions on the peculiarities of retorted shale materials to be investigated and discussions of the various laboratory and field tests which would need to be conducted to define their physical and chemical properties

Data and Resources

Field Value
Citation "\"Holtz, W.G.\""
Is NETL associated "\"Yes\""
NETL Point of Contact "\"Roy Long\""
NETL Point of Contact's Email "\"Roy.long@netl.doe.gov\""
NETL program or project "\"KMD\""
Publication Date "\"12/15/1975\""
Groups
  • AmeriGEOSS
  • Global Provider
Tags
  • amerigeo
  • amerigeoss
  • ckan
  • edx
  • energy
  • energy-data-exchange
  • geo
  • geoss
  • global
  • kmd
isopen True
license_id other-open
license_title Other (Open)
metadata_created 2025-11-25T23:11:12.571369
metadata_modified 2025-11-25T23:11:12.571373
notes A preliminary program dated April 25, 1974, was prepared for Development Engineering, Inc. (DEI) on research and development, for laboratory, field and other engineering studies on the disposal of retorted oil shale. This program was revised and published as a final document dated December 17, 1974. The document included discussions on the peculiarities of retorted shale materials to be investigated and discussions of the various laboratory and field tests which would need to be conducted to define their physical and chemical properties
num_resources 1
num_tags 10
title Research and development program on the disposal of retorted oil shale; Paraho Oil Shale Project. Laboratory tests on retorted shale from the direct heated semi-works plant. Interim report 13 Feb--24 Oct 1975, on Phase 4, Part 1