This Technical Concept describes the proposed Project Bronco in enough detail that time and cost estimates can be made. The Concept is also intended to serve as a technical basis for discussions among the participants in the experiment. However, it should be emphasized that the experimental design will change somewhat as more technical information becomes available and as better methods for achieving the experiments objective become apparent. It is expected that future modifications of the design will result in costs which are not appreciably different than those projected here.