Performance Metrics - Buildings - Time to Issue Standard Plan Review Program Permits

The Department of Building (DOB) issues building permits to give individuals, insurance companies, neighbors and the City assurance that specific minimum standards are met in constructing, repairing or altering buildings by complying with the Chicago Building Code. This metric tracks the average number of days DOB takes to process Standard Plan Review Program building permits, grouped by the week the permit was processed. The target process time is within 53 days. The Standard Plan Review Program is designed for small to mid-sized construction or renovation projects requiring drawings. Eligible projects include buildings up to 80 feet high, institutional or mercantile properties under 100,000 square feet, residential properties of up to 12 units, and foundations no deeper than 12 feet. For more information, go to http://www.cityofchicago.org/city/en/depts/bldgs/supp_info/overview_of_the_standardplanreviewpermitprogram.html.

Data and Resources

Field Value
accessLevel public
catalog_@context https://project-open-data.cio.gov/v1.1/schema/catalog.jsonld
catalog_@id https://data.cityofchicago.org/data.json
catalog_conformsTo https://project-open-data.cio.gov/v1.1/schema
catalog_describedBy https://project-open-data.cio.gov/v1.1/schema/catalog.json
identifier https://data.cityofchicago.org/api/views/4ygs-9x34
issued 2013-12-18
landingPage https://data.cityofchicago.org/d/4ygs-9x34
modified 2014-08-04
publisher data.cityofchicago.org
resource-type Dataset
source_datajson_identifier true
source_hash de612328d85c617b464f6909791ce3b2d5601f2ca584f008b89d3be0d2eb6741
source_schema_version 1.1
theme {"Administration & Finance"}
Groups
  • AmeriGEOSS
  • National Provider
  • North America
Tags
  • AmeriGEO
  • AmeriGEOSS
  • CKAN
  • GEO
  • GEOSS
  • National
  • North America
  • United States
  • buildings
  • performance-metrics
  • permits
  • service-delivery
isopen False
license_id notspecified
license_title License not specified
maintainer cocadmin
maintainer_email no-reply@data.cityofchicago.org
metadata_created 2025-09-24T06:33:38.141244
metadata_modified 2025-09-24T06:33:38.141255
notes The Department of Building (DOB) issues building permits to give individuals, insurance companies, neighbors and the City assurance that specific minimum standards are met in constructing, repairing or altering buildings by complying with the Chicago Building Code. This metric tracks the average number of days DOB takes to process Standard Plan Review Program building permits, grouped by the week the permit was processed. The target process time is within 53 days. The Standard Plan Review Program is designed for small to mid-sized construction or renovation projects requiring drawings. Eligible projects include buildings up to 80 feet high, institutional or mercantile properties under 100,000 square feet, residential properties of up to 12 units, and foundations no deeper than 12 feet. For more information, go to http://www.cityofchicago.org/city/en/depts/bldgs/supp_info/overview_of_the_standardplanreviewpermitprogram.html.
num_resources 4
num_tags 12
title Performance Metrics - Buildings - Time to Issue Standard Plan Review Program Permits