Utah FORGE: Video of Utah FORGE Drilling Planning for Production Well 16B(78)-32

This is a YouTube video containing the specifics of well planning for Utah FORGE 16B(78)-32. This well will be drilled as a doublet approximately 300 feet parallel to and above 16A(78)-32 and will be drilled between approximately April 15th and July 17th 2023.

Data and Resources

Field Value
accessLevel public
bureauCode {019:20}
catalog_@context https://openei.org/data.json
catalog_@id https://openei.org/data.json
catalog_conformsTo https://project-open-data.cio.gov/v1.1/schema
catalog_describedBy https://project-open-data.cio.gov/v1.1/schema/catalog.json
dataQuality true
datagov_dedupe_retained 20250120155001
identifier https://data.openei.org/submissions/7574
issued 2023-03-03T07:00:00Z
landingPage https://gdr.openei.org/submissions/1481
license https://creativecommons.org/licenses/by/4.0/
modified 2023-07-17T23:39:23Z
old-spatial {"type":"Polygon","coordinates":[[[-112.916367,38.483935],[-112.879748,38.483935],[-112.879748,38.5148],[-112.916367,38.5148],[-112.916367,38.483935]]]}
programCode {019:006}
projectLead Lauren Boyd
projectNumber EE0007080
projectTitle Utah FORGE
publisher Energy and Geoscience Institute at the University of Utah
resource-type Dataset
source_datajson_identifier true
source_hash f13b6e9acbf490041a84e1bc2ddf4a0ae5b3b7e778202f2e2af8959e833536ad
source_schema_version 1.1
spatial {"type":"Polygon","coordinates":[[[-112.916367,38.483935],[-112.879748,38.483935],[-112.879748,38.5148],[-112.916367,38.5148],[-112.916367,38.483935]]]}
Groups
  • AmeriGEOSS
  • National Provider
  • North America
Tags
  • AmeriGEO
  • AmeriGEOSS
  • CKAN
  • GEO
  • GEOSS
  • National
  • North America
  • United States
  • circulation-testing
  • doublet-pair
  • drilling
  • egs
  • energy
  • fiber-optic
  • geothermal
  • injection-testing
  • processed-data
  • stress-measurement
  • utah-forge
  • vibrations
  • well-16b78-32
  • well-planning
  • well-planning-video
isopen True
license_id cc-by
license_title Creative Commons Attribution
license_url http://www.opendefinition.org/licenses/cc-by
maintainer John McLennan
maintainer_email jmclennan@egi.utah.edu
metadata_created 2025-09-24T18:56:52.845724
metadata_modified 2025-09-24T18:56:52.845733
notes This is a YouTube video containing the specifics of well planning for Utah FORGE 16B(78)-32. This well will be drilled as a doublet approximately 300 feet parallel to and above 16A(78)-32 and will be drilled between approximately April 15th and July 17th 2023.
num_resources 2
num_tags 23
title Utah FORGE: Video of Utah FORGE Drilling Planning for Production Well 16B(78)-32