Baseline System Costs for a 50 MW Enhanced Geothermal System 2012
Data e Risorse
-
Final Report.pdfPDF
Baseline system costs for a 50 MW enhanced geothermal system as a function of...
| Campo | Valore |
|---|---|
| accessLevel | public |
| bureauCode | {019:20} |
| catalog_@context | https://openei.org/data.json |
| catalog_@id | https://openei.org/data.json |
| catalog_conformsTo | https://project-open-data.cio.gov/v1.1/schema |
| catalog_describedBy | https://project-open-data.cio.gov/v1.1/schema/catalog.json |
| dataQuality | true |
| identifier | https://data.openei.org/submissions/2995 |
| issued | 2012-04-30T06:00:00Z |
| landingPage | https://gdr.openei.org/submissions/107 |
| license | https://creativecommons.org/licenses/by/4.0/ |
| modified | 2017-05-16T17:24:39Z |
| old-spatial | {"type":"Polygon","coordinates":[[[-72.6730515625,42.204313928357],[-72.203487207031,42.204313928357],[-72.203487207031,42.576752573011],[-72.6730515625,42.576752573011],[-72.6730515625,42.204313928357]]]} |
| programCode | {019:006} |
| projectLead | Arlene Anderson |
| projectNumber | EE0002742 |
| projectTitle | Recovery Act: Baseline System Costs for 50.0 MW Enhanced Geothermal System -- A Function of: Working Fluid, Technology, and Location, Location, Location |
| publisher | Gas Equipment Engineering Corporation |
| resource-type | Dataset |
| source_datajson_identifier | true |
| source_hash | 3e23edf278702435dde3b68f60e3ec77c49be6a2 |
| source_schema_version | 1.1 |
| spatial | {"type":"Polygon","coordinates":[[[-72.6730515625,42.204313928357],[-72.203487207031,42.204313928357],[-72.203487207031,42.576752573011],[-72.6730515625,42.576752573011],[-72.6730515625,42.204313928357]]]} |
| Gruppi |
|
| Tag |
|
| isopen | True |
| license_id | cc-by |
| license_title | Creative Commons Attribution |
| license_url | http://www.opendefinition.org/licenses/cc-by |
| maintainer | Nancy Selman |
| maintainer_email | ncs@avalence.com |
| metadata_created | 2025-11-21T01:40:08.525514 |
| metadata_modified | 2025-11-21T01:40:08.525519 |
| notes | Substantial unexploited opportunity exists for the US, and the world, in Enhanced Geothermal Systems (EGS). This cost analysis study provides a baseline cost for a 50 MW Geothermal Power Plant in a challenging New England environment. The study then assesses how project costs would change as a function of (1) geothermal working fluid, that is, CO2 vs. water, (2) drilling technology, (3) CO2 generation technology, and (4) other geographic locations. |
| num_resources | 1 |
| num_tags | 19 |
| title | Baseline System Costs for a 50 MW Enhanced Geothermal System 2012 |