Energy Efficiency Program Participation

Between 1982 and 2006, Austin Energy's energy efficiency programs offset the need to build a 700 megawatt (MW) power plant. This became known as Austin Energy's first conservation power plant. In 2007, Austin Energy kicked off a new goal with the Austin Climate Protection Plan, which is to offset another 800 MW of peak energy demand by 2020. Between 2007 and 2012, Austin Energy has offset an additional 318 MW which is 40% of the 800 MW goal.

Note: Total participation does not include GB commercial square foot.

Blank cells indicate data are not available because the program either had not started, has been discontinued, or we no longer track that data.

Data e Risorse

Campo Valore
accessLevel public
catalog_@context https://project-open-data.cio.gov/v1.1/schema/catalog.jsonld
catalog_@id https://data.austintexas.gov/data.json
catalog_conformsTo https://project-open-data.cio.gov/v1.1/schema
catalog_describedBy https://project-open-data.cio.gov/v1.1/schema/catalog.json
identifier https://data.austintexas.gov/api/views/h47z-b72v
issued 2020-04-01
landingPage https://data.austintexas.gov/d/h47z-b72v
modified 2021-04-14
publisher data.austintexas.gov
resource-type Dataset
source_datajson_identifier true
source_hash bbe74e18082bb2fc3e0ba1500694bd364fc3e9ec
source_schema_version 1.1
theme {"Utilities and City Services"}
Gruppi
  • AmeriGEOSS
  • National Provider
  • North America
Tag
  • amerigeo
  • amerigeoss
  • ckan
  • climate-protection
  • energy
  • energy-efficiency
  • geo
  • geoss
  • national
  • north-america
  • power
  • united-states
isopen False
license_id notspecified
license_title License not specified
maintainer Austin Energy
maintainer_email no-reply@data.austintexas.gov
metadata_created 2025-11-22T23:20:07.409705
metadata_modified 2025-11-22T23:20:07.409709
notes Between 1982 and 2006, Austin Energy's energy efficiency programs offset the need to build a 700 megawatt (MW) power plant. This became known as Austin Energy's first conservation power plant. In 2007, Austin Energy kicked off a new goal with the Austin Climate Protection Plan, which is to offset another 800 MW of peak energy demand by 2020. Between 2007 and 2012, Austin Energy has offset an additional 318 MW which is 40% of the 800 MW goal. Note: Total participation does not include GB commercial square foot. Blank cells indicate data are not available because the program either had not started, has been discontinued, or we no longer track that data.
num_resources 4
num_tags 12
title Energy Efficiency Program Participation