Jurisdictional Peaker Power Plants

2001 California Emergency Siting Peaker Power Plant PermittingIn 2001, Governor Davis identified a goal of bringing 1,000 megawatts of new power plants to meet the electricity needs during peak demand periods. Typically these are simple-cycle power plants that can be constructed in a relatively small area, do not require water supplies for cooling, and can readily be connected to the existing transmission and natural gas system. The Governor directed the Energy Commission to use its emergency power plant permitting authority under Public Resources Code 25705 to permit new peaking and renewable power plants that could be online by September 30, 2001.For more information about Peaker Projects contact:Joe DouglasCompliance Project ManagerSTEP Division916-653-4677Joe.Douglas@energy.ca.gov

Data e Risorse

Campo Valore
accessLevel public
catalog_@context https://project-open-data.cio.gov/v1.1/schema/catalog.jsonld
catalog_conformsTo https://project-open-data.cio.gov/v1.1/schema
catalog_describedBy https://project-open-data.cio.gov/v1.1/schema/catalog.json
identifier f58efcc2-5565-4642-8b51-e0fa08f80229
issued 2020-04-24T07:05:49.000Z
modified 2022-01-24T20:14:36.000Z
publisher California Energy Commission
resource-type Dataset
source_datajson_identifier true
source_hash b7e534ffb1a67f2663dcbadce5fcc533ff398511
source_schema_version 1.1
theme {"Natural Resources"}
Gruppi
  • AmeriGEOSS
  • National Provider
  • North America
Tag
  • amerigeo
  • amerigeoss
  • california-energy-commission
  • california-natural-resources-agency
  • caopendata
  • ckan
  • geo
  • geoss
  • map
  • national
  • natural-gas
  • north-america
  • pdf
  • power-plant
  • step
  • united-states
isopen False
license_id notspecified
license_title License not specified
maintainer acampos_CAEnergy
maintainer_email gis@energy.ca.gov
metadata_created 2025-11-20T04:14:51.192323
metadata_modified 2025-11-20T04:14:51.192328
notes <div style='font-family: inherit;'><div style='font-family: inherit;'><font size='4' style='font-family: inherit;'>2001 California Emergency Siting Peaker Power Plant Permitting</font></div></div><div style='font-family: inherit;'><br /></div><div style='font-family: inherit;'>In 2001, Governor Davis identified a goal of bringing 1,000 megawatts of new power plants to meet the electricity needs during peak demand periods. Typically these are simple-cycle power plants that can be constructed in a relatively small area, do not require water supplies for cooling, and can readily be connected to the existing transmission and natural gas system. The Governor directed the Energy Commission to use its emergency power plant permitting authority under Public Resources Code 25705 to permit new peaking and renewable power plants that could be online by September 30, 2001.<br /></div><div style='font-family: inherit;'><br /></div><div style='font-family: inherit;'>For more information about Peaker Projects contact:</div><div style='font-family: inherit;'>Joe Douglas</div><div style='font-family: inherit;'>Compliance Project Manager</div><div style='font-family: inherit;'>STEP Division</div><div style='font-family: inherit;'>916-653-4677</div><div style='font-family: inherit;'>Joe.Douglas@energy.ca.gov</div><div style='font-family: inherit;'><br /></div>
num_resources 1
num_tags 16
title Jurisdictional Peaker Power Plants