-
Underground stress engineering: the lifting and stabilization of underground voids
The theoretical basis of how grout, i.e., concrete, pumped into rock fractures prevents the caving of underground tunnel and cavity roofs is presented, and the calculation of... -
Drilling and early testing of a sidetrack from the slant hole completion test well
During the winter of 1990 to 1991, the Department of Energy evaluated several options to completing the originally-planned slant hole production tests. A decision was made to... -
Enhanced Oil Recovery (EOR) Program Archive, Version 2.0
The 2009 Enhanced Oil Recovery (EOR) Program Archive is part of U.S. Department of Energy's (DOE) Fossil Energy technology transfer effort to make previous DOE funded RD&D more... -
Geological evolution and analysis of confirmed or suspected gas hydrate...
This report presents a geological description of the Panama Basin, including regional and local structural settings, geomorphology, geological history, stratigraphy, and... -
ECONOMIC EVALUATION OF BOREHOLE AND CONVENTIONAL MINING SYSTEMS IN PHOSPHATE DEPOSITS
"The Bureau of Mines compared the feasibility of mining deep phosphate deposits by a borehole mining system with mining by proven conventional technique. An economic comparison... -
Expansion of high-temperature, high-pressure data set for coal gasification:...
Coal devolatilization is one of the most important factors in gasification and combustion processes. It encompasses the initial release of volatiles, sets the stage for... -
The Use of Acid Stimulation for Restoring to Production Shut-in Oil Fields
High operating costs and low oil prices caused oil and gas production from the St. James lease to be shut in early 1998. The St. James lease is located in the Las Cienegas field... -
HYDRAULIC-POWERED PLATFORM FOR SCALING HIGH BACKS AND WALLS
A hydraulic scaling rig was placed in operation at the Bureau of Mines oil shale mine near Rifle, Colo., in 1953. The rig consists of a self-leveling platform mounted on a... -
Analysis of fracturing mechanisms in naturally fractured rocks. Fifth...
Progress reports are presented for tasks 1 through 4. Task 1 - Hydraulic/Natural Fracture Interaction. This task was completed in this reporting period. The primary result is a... -
INFORMATION PACKAGE : OIL SHALE TRACT C-B, OCCIDENTAL OIL SHALE INC.
In recognition of the vast oil shale resources in the states of Colorado, Utah and Wyoming and the potential they offer to help alleviate a growing energy problem, the Secretary... -
Hot-Gas Cleanup for Molten Carbonate Fuel Cells-Dechlorination and Soot Formation
Two separate aspects of hot-gas conditioning for molten carbonate fuel cells (MCFC) were investigated under this contract: potential high temperature chloride sorbent materials... -
TOPICAL REPORT FOR WATER FLOODING TO MAINTAIN AND CONTROL THE PROCESS ZONE...
A novel shale oil recovery system is undergoing exploratory development at TRW to improve the efficiency of retorting pyrolysis in an in situ rubblized retort. Application of... -
REPORT OF EXPERIMENT NO. 9 ON GAS-COMBUSTION PILOT PLANT NO. 1 Investigation...
"The object of this experiment was to determine the effect of adding water directly to the suspended tube air-gas distributor at a controlled rate." -
ROME TROUGH CONSORTIUM Plate 11B
Dip Line 8, Stratigraphic section -
Geologic Atlas: Waynesburg folio, Pennsylvania
From the site: “The Geologic Atlas of the United States is a set of 227 folios published by the U.S. Geological Survey between 1894 and 1945. Each folio includes both... -
Rapid Surface Sampling and Archival Record (RSSAR) System. Topical report,...
This report describes the results of Phase 1 efforts to develop a Rapid Surface Sampling and Archival Record (RSSAR) System for the detection of semivolatile organic... -
Preliminary study of the remote sensing of a modified in situ oil shale...
A preliminary study has been conducted to ascertain the feasibility of interrogating a vertical modified in situ oil shale retort by high frequency electromagnetic methods. The... -
Coal-fired fluid-bed cogeneration
The use of coal for steam generation to satisfy the need for process steam and electrical energy in process plants had been the conventional technology since the days of the... -
MERCURY STABILIZATION IN CHEMICALLY BONDED PHOSPHATE CERAMICS*
Mercury stabilization and solidification is a significant challenge for conventional stabilization technologies. This is because of the stringent regulatory limits on leaching... -
Prediction of fracture extent by simulation of gas well pressure and...
The use of transient gas reservoir simulation techniques for the purpose of evaluating fracture geometry in two different types of formations is described. Extensive efforts...